    Gravel vs Concrete vs Asphalt Cost Comparison

    Gravel is far cheaper to install but needs topping up. Concrete costs three times as much upfront and lasts decades. This calculator runs both numbers — the install price and the twenty-year total including maintenance — so the comparison is honest rather than just the sticker price.

    Inputs

    Most gravel driveways need 2 inches of fresh stone every 2–4 years.

    What you'll need

    As an Amazon Associate I earn from qualifying purchases.

    Prices as of Sep 25, 2026, 6:18 PM UTC. Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon.com at the time of purchase will apply to the purchase of this product.

    Get the Gravel & Stone Calculator app for Android

    Estimate gravel, stone, sand, and mulch on the job site, save projects, and share quantities with your supplier.

    Building something else? Try our sister calculators

    Frequently asked questions

    Is a gravel driveway cheaper than concrete?
    Yes, substantially. Gravel installs at $2.50–$6.00 per square foot against $8–$18 for concrete. Even after twenty years of periodic top-ups, gravel usually remains the cheaper option.
    How often does a gravel driveway need new gravel?
    Most need about 2 inches of fresh top stone every two to four years, depending on traffic, slope, and climate. Regular grading extends that interval considerably.
    Does a gravel driveway hurt resale value?
    In rural and semi-rural areas, no — gravel is expected. In suburban neighbourhoods where every other house has concrete or asphalt, appraisers do sometimes mark it down.